AGS Field Service Knowledge Base

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

  1. After the initial install, a 2-week PM/Check is necessary. Reference pages 17-18 of the DexS manual for the information required on this initial PM/Check.

  2. An interval of every two weeks PM is required. Dependent upon how much the DexS has been used will be apparent on how dirty the pads/rollers are. Even if the DexS appears clean, reference pages 19-24 of the DexS Manual and clean the listed components thoroughly. If the elevator and/or sweeper arm pads show signs of premature wear and tear, replace them to prevent future damage to the playing cards. 

2 week pm

  1. remove front cover

  2. blow shuffler out with data vac

  3. clean sensors

  4. clean rollers

  5. inspect belts and pads

  6. test

  7. wipe down top and covers with glass cleaner

  8. install front cover

The 3-Month PM is more extensive and requires the cleaning and replacement of certain components; mainly the elevator/swing arm pads. The worm Gear must be *lubricated at this time. Reference pages 20-26 of the DexS manual for these detailed instructions.

3 month pm

  1. remove front and back covers

  2. blow shuffler out with data vac

  3. clean sensors

  4. clean rollers

  5. replace elevator pads (C40-000254 quantity 2)

  6. lube worm gear
    *Important; when lubricating the Worm Gear, use only DRY LUBRICANT with PTFT or Teflon as clearly noted on page 25 of the DexS service manual. *

  7. clear cycles and logs

  8. test

  9. wipe down top and covers with glass cleaner

  10. Install covers


6 Month PM

The 6-month PM (noted on page 19 of the DexS manual) includes additional part replacements including the rollers, roller belts and sweeper arm pads. The items cleaned and replaced during the 3-month PM are due for service again as well at the 6-month PM. This includes the *lubrication of the worm gear and the cleaning of all sensors. Reference pages 25-35 of the DexS manual for these detailed instructions which include helpful images.

  1. remove front and back covers

  2. blow out shuffler with data vac

  3. replace back and face rollers, roller belts and bushings.
    (DO NOT ROLL NEW BELT OVER PULLEY)

  4. replace elevator and sweeper pads

  5. lube worm gear

  6. clean sensors

  7. check sweeper and trap door settings

  8. by running sweeper cycle

  9. test shuffler

  10. wipe down top and covers with glass cleaner

  11. install covers


There is a Production Kit you can order for all the parts below - C21-00008

6 MONTH - PM MAINTENANCE ITEMS

Qty needed per shuffler

C130538

Roller Assembly

2

C130607

Flanged Sleeve Bearing

2

C130655

Timing Belt MXL 71 Tooth

2

C40-00254

Card Pad

4

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.