Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The 3-Month PM is more extensive and requires the cleaning and replacement of certain components; mainly the elevator/swing arm pads. The worm Gear must be *lubricated at this time. Reference pages 20-26 of the DexS manual for these detailed instructions.

...

  1. remove front and back covers

  2. blow shuffler out with data vac

  3. clean sensors

  4. clean rollers

  5. replace elevator pads (C40-000254 quantity 2)

  6. lube worm gear
    *Important; when lubricating the Worm Gear, use only DRY LUBRICANT with PTFT or Teflon as clearly noted on page 25 of the DexS service manual. *

  7. clear cycles and logs

  8. test

  9. wipe down top and covers with glass cleaner

  10. Install covers

...