Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Embedded Progressive Controller requires an isolated network on a dumb (i.e. unmanaged) switch. The game network (eth0) is to be plugged into said switch. Nothing should be plugged into the spare network (eth1) on any cabinetstandard gigabit switch. Use the normal Game port on the logic to the switch for every game.

  1. Two games must be set as Host and no more than two or it will cause issues.

  2. No more than eight games connected on the same EPC network.

  3. All game must share the same set of pools no extras.

  4. All games must be EPC and not on a progressive controller.

  5. All games must be the same hold percentage.

  6. All games must be the same Scaling if applicable.

  7. Games do not need to be the same LCs.

Warning

This does not work with all titles. If you have questions about what themes work together get with TAC or Product Support who will request info from Product Management.

Gliffy
imageAttachmentIdatt16264429640
macroIde177f3d7-ef1e-4975-bc7c-238d8e0eacd3
baseUrlhttps://playags.atlassian.net/wiki
nameePC Bank
diagramAttachmentIdatt16264396854
containerId16261480459
timestamp

...

1726867822354

Initial Setup Process After RAM Clear

Progressive Settings

...

 From the Progressive Host Controller Type dropdown, Select:

...

Select the check box “Set this EPS as Embedded Host” if the EPS being configured will be used as progressive Host.

Warning

You NEED to set two games as “Embedded Host” but only two games. Do not check the box on all the games, just two of them.

...

Continue to remaining initial setup process

...

Note: This menu only displays progressive pools configured for this EPS. In order to see all the pools configured by the embedded progressive controller host, click the “EmbeddedController” button on this menu.

Linked_Progressive_Menu_After_RAM_Clear.pngImage Modified

In order to access the “Auto Configure” menu, Logic and Main door needs to opened.

NOTE: if you get here, and there is no Auto Configure button, you may have gotten here before all the ePC services have started up, and/or the active and standby hosts haven’t quite negotiated yet. OR… if you are attempting to run the bank with only a single host, you need to manually override data authentication to do so. If this is the case, see this /wiki/spaces/OT/pages/16623370318 page.

Linked_Progressive_Menu_After_RAM_Clear_n_Door_Open.pngImage Modified

Select “Auto Configure” option and the following confirmation prompt appears,

Linked_Progressive_Menu_Auto_Configure_Confirmation.pngImage Modified

While the auto configuration process is in progress, the following progress screen appears,

Linked_Progressive_Menu_Auto_Configure_Progress_Banner.pngImage Modified

Auto Configures option displays default pool settings generated from the host and automatically adds the EPS to the pools.  Once auto configured, the progressive pool table will be displayed as shown below:

...

Navigation: Operator Menu > Linked Progressives > EmbeddedController

Menu_2024-06-29-23_18_25.pngImage Modified

NOTE: To distinguish EPS level progressive configuration against the host level progressive configurations, the menu that only applies to host have different background color

...

  • Change Max Value or Pool Contribution Rate

  • Deposit Funds

  • Activate inactive pool

  • Change a Pool Name

  • View Progressive Wins records from all the linked EPS’s

...

TroubleShooting

When a Host goes down you will need to Ramclear another game and set it as Host or repair the orignal Host. The pic below is what you will see when one of the Hosts goes offline.

...